The running costs are already very high for a minimum service, it has not been possible to put the following into operation :
- A fully operational laboratory - The x-ray department - Pre natal classes - The collection of our staff on strike days and at night.
We believe the following list of equipment is indispensable in order to ensure maximum service and for the long term reputation of the hospital.


U.S DOLLARS

1 - Minibus 30 000
2 - Coagulation analyser 1 500
3 - Blood gazes analyser 20 000
4 - Cryo cauterisation machine . 8 000
5 - Syringe pump 2 500
6 - (2) digital baby scale 1 200
7 - Phototherapy lamp ............... 1 000
8 - Neonatal reanimation table 7 000
9 - (2) infusion pump 3 000
10 - Oxygen monitor 1 000
11 - Apnea monitor 1 000
12 - Laser therapy for cervix CA 40 000
13 - Electrocyte analyser 6 500
14 - Water distiller 2 500

TOTAL 125 000 $

Phase I was completed in 1990 with the renovation and equipping of 27 beds with a 2 bed delivery suite and an operating room.

The cost of these renovations was largely met with grants from the European Union. Some of the equipment was provided by donations -Notably The PAlm Beach Group.